January 16th Energy News: National Development and Reform Commission: New Energy Stations, New Energy Storage Regulations! Effective from April 1st!
Release time:
2024-05-22
Recently, the National Development and Reform Commission issued Order No. 8 of the National Development and Reform Commission of the People's Republic of China. The "Interim Measures for the Management of Electric Energy Quality" were reviewed and approved at the 7th executive meeting on December 26, 2023, and will come into effect on April 1, 2024.
Recently, the National Development and Reform Commission issued Order No. 8 of the National Development and Reform Commission of the People's Republic of China. The "Interim Measures for the Management of Electric Energy Quality" were reviewed and approved at the 7th executive meeting on December 26, 2023, and will come into effect on April 1, 2024. The Measures point out that power generation enterprises should comply with power dispatch instructions and implement measures related to frequency regulation and voltage regulation to ensure that the quality of electricity meets national standards. Power generation enterprises should carry out information collection and problem analysis and governance capacity building related to power quality management, establish a ledger for interference source equipment such as inverters, governance equipment, and monitoring devices, and regularly maintain and update it. Secondly, newly constructed (renovated, expanded) new energy stations, distributed power sources with voltage levels of 10 kV and above connected to the grid, and new energy storage should conduct power quality assessments during the feasibility study stage of connecting to the power system planning, install online monitoring devices for power quality, and take necessary measures to prevent and control power quality. Governance equipment and online monitoring devices should be designed, constructed, inspected, and put into operation simultaneously with the main project. During the trial operation phase (within 6 months), power quality monitoring should be carried out, and proactive measures should be taken to address exceeding indicators. In addition, equipment with necessary power quality monitoring functions should be equipped for grid connected voltage levels below 10 kV, and warning and active control of exceeding power quality indicators should be carried out. If the electricity quality indicators do not comply with the relevant provisions of national standards, preventive measures should be taken. When the power quality still does not meet the national standards after taking prevention and control measures, which affects the safe operation of the power grid or the normal use of electricity by other power users, the power grid enterprise should cooperate to implement output control or off grid control.